JD Edwards for asset-intensive industries

In some businesses the money is not in people and not in raw material, it is in iron. Mining fleets, process units, pumps, turbines, vehicle parks. On these sites the cost of the product is decided by how the assets behave: how long they stood idle, what the repair cost, whether the right part was on the shelf. And almost everywhere assets are tracked as objects of depreciation rather than as sources of cost, which makes that share impossible to manage. JD Edwards EnterpriseOne puts the asset at the centre of the accounting model.

In short

  • Every unit of equipment is an object that all related costs are charged to.
  • Total cost of ownership as a real figure rather than an estimate.
  • Maintenance by usage and by condition, scheduled around the production plan.
  • A spare parts store that knows about upcoming work in advance.
  • Cost by processing stage instead of a single pooled figure.
  • Health and safety permits tied to work on assets.

Sound familiar?

  • Unplanned repairs make up most of the work, while planned maintenance is postponed because of the production schedule.
  • The cost of owning a particular machine is unknown: fuel, repairs, parts and labour sit in different places.
  • A part is needed today and is not there, while the same part has sat unused at a neighbouring site for two years.
  • Downtime is recorded, but in the report its cause reads as organisational loss.
  • Replacement decisions are made on age and mileage rather than on what the machine costs to keep.
  • Work permits are issued on paper and live separately from the maintenance request.

Why the asset has to be costed separately

In an asset-intensive business the equipment fleet forms the main share of cost. But while costs are collected by department rather than by unit, nothing inside that share is visible. Two identical trucks can differ several times over in running cost, and that is impossible to detect when both belong to the same shop.

The second reason is the gap between maintenance and supply. The chief engineer plans the work, procurement buys against requests, the store issues on demand. Three different logics that meet only at the moment the machine is already down and the part is missing. Hence the dominance of unplanned repairs: the system runs in reaction mode.

The third is pooled costing. When costs are spread in proportion to output, expensive and cheap stages carry the same load, and the economics of individual products stay unknown.

What JD Edwards closes

The asset as a cost object

A unit of equipment exists in the system as an object carrying fuel, repairs, parts, mechanics’ labour and rental. Usage is recorded in engine hours, tonne-kilometres or cycles. Cost of ownership becomes a number you can compare across machines.

Maintenance by usage and condition

Preventive work is planned from usage rather than the calendar, and scheduled against the production plan. For critical equipment, condition-based maintenance driven by measurements is added.

A spare parts store tied to maintenance

Demand is generated from the maintenance plan rather than from emergency requests. The system sees the upcoming job and checks availability in advance. Stock across all sites is visible in one place, so a transfer becomes an alternative to a purchase.

Cost by processing stage

Costs are collected by stage rather than by legal entity, including co-products and returnable materials. You can see exactly where cost arises.

Health and safety

Permits, briefings and qualifications are linked to types of work and to equipment. The system will not let a job open on equipment without a valid permit for the person doing it. Incidents are recorded against location, asset and contractor.

What this section covers

How it is implemented

  1. Equipment register. Units, components, usage standards, work catalogues. This stage usually shows that part of the fleet is recorded differently from how it actually operates.
  2. Maintenance and the spare parts store. The chain of maintenance plan, demand and purchase. Normally the fastest visible result.
  3. Costs on assets. Fuel, labour and materials collected per unit, cost of ownership calculated.
  4. Stage costing. The calculation is switched on and checked against what is currently done by hand.
  5. Health and safety, and automation. Permits, incidents, and scheduled operations moved to orchestration.

Worth knowing up front

  • Everything rests on discipline in primary recording on site. If usage and consumption are recorded after the fact from memory, the system will show that honestly but will not fix it.
  • The equipment register will have to be put in order, and that is work for your engineering department. We size it at the start so it is not a surprise halfway through.
  • The first honest cost of ownership figure often changes fleet renewal plans. It is worth being ready for that.

Frequent questions

We already have a maintenance system. Why change?

You do not have to. The question is whether it is connected to costs and to the store. A standalone maintenance system solves the engineer’s problem but does not answer the question about product cost. If it works for you, it can stay and be connected through an integration, and we will say plainly when that is the better choice.

Does this work across several sites at once?

Yes. A multi-site structure with a shared equipment and parts catalogue is the typical scenario. Visibility of stock across the group usually cuts purchasing straight away.

Is this too heavy for a mid-sized business?

The contour is deployed in parts. Starting with maintenance and the spare parts store needs no rebuild of the whole accounting model, and costing follows as the next stage.

What about long term support?

Oracle has moved to continuous delivery: new features arrive without a version change and without a reimplementation. Premier Support for JD Edwards EnterpriseOne is guaranteed at least through 2037, with the date reviewed annually and extended.

Let us calculate what your assets cost to own

We will show you, on your own data, what keeping the fleet costs and how that lands in product cost. We will work out which area makes sense to tackle first.

Solutions in this section: mining and metals, oil and gas production, refining and marketing.

A workshop on your data

We take part of your equipment fleet: cost of ownership, the maintenance plan and how both land in product cost.

  • What you get: a written map of the gaps on the area we reviewed, plus an estimate of the stages and the effort involved.
  • What we need from you: 2-3 hours of your specialists’ time and access to data extracts.
  • Timing: two weeks from the first meeting to the result. No commitment, no prepayment.