{"id":8344,"date":"2026-11-28T00:50:10","date_gmt":"2026-11-27T18:50:10","guid":{"rendered":"https:\/\/rbc-grp.solutions\/?page_id=8344"},"modified":"2026-11-28T01:06:59","modified_gmt":"2026-11-27T19:06:59","slug":"mining-and-metals","status":"publish","type":"page","link":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/mining-and-metals\/","title":{"rendered":"JD Edwards for mining and metals"},"content":{"rendered":"<p><strong>In mining, cost per tonne decides everything, and it is built from what happens in the pit, not in the accounting office.<\/strong> A truck stood idle for a shift, an excavator went into unplanned repair, the part was not on the shelf, diesel was written off as a single line for the whole area. Each of those events adds its share to the cost of a tonne, and none of them reaches the books attached to a specific machine. JD Edwards EnterpriseOne collects costs where they arise: on the asset, on the area, on the processing stage.<\/p>\n<div style=\"background:#eaf0fd;border-radius:16px;padding:22px 28px 16px;margin:26px 0 32px;\">\n<p style=\"margin:0 0 10px;font-size:13px;font-weight:700;letter-spacing:.08em;text-transform:uppercase;color:#1f4fd8;\">In short<\/p>\n<ul style=\"margin:0;padding-left:20px;color:#14213d;\">\n<li style=\"margin:0 0 8px;\">Cost by stage: from overburden and extraction through processing to finished metal.<\/li>\n<li style=\"margin:0 0 8px;\">Costs attached to a unit of equipment and an area, not to a department as a whole.<\/li>\n<li style=\"margin:0 0 8px;\">Maintenance by usage and condition, planned around the mining schedule.<\/li>\n<li style=\"margin:0 0 8px;\">A spare parts store that knows what the coming repairs will need.<\/li>\n<li style=\"margin:0 0 8px;\">Fuel and lubricants with standards and actuals per machine.<\/li>\n<li style=\"margin:0;\">Health and safety permits in the same contour as work on assets.<\/li>\n<\/ul>\n<\/div>\n<h2>Sound familiar?<\/h2>\n<ul>\n<li>Cost per tonne is calculated at month end, and by the time it is ready it no longer helps anyone decide anything.<\/li>\n<li>The cost of owning a particular truck is unknown: repairs, fuel and tyres sit in different places.<\/li>\n<li>Unplanned repairs make up most of the work, and preventive maintenance is postponed because of the mining plan.<\/li>\n<li>A part is needed today and is not there, although it has sat unused at another store in the group for two years.<\/li>\n<li>Diesel consumption differs between standard and actual, and the difference cannot be explained machine by machine.<\/li>\n<li>Permits for hazardous work are issued on paper and live apart from the maintenance request.<\/li>\n<\/ul>\n<h2>Why costs do not line up with stages<\/h2>\n<p>Mining and processing are a chain of stages, each taking the product of the one before. To understand the economics you need the cost at every junction: what overburden cost, what extraction cost, what processing cost. If accounting is organised by department rather than by stage, that chain breaks and only a total for the enterprise remains.<\/p>\n<p>The second reason is the fleet. At most sites mining equipment is tracked as fixed assets, that is as objects of depreciation rather than as sources of cost. Yet the fleet forms the main share of cost: fuel, repairs, tyres, parts, mechanics&#8217; labour. Until there is a link between a cost, a unit of equipment and the area it worked, that share cannot be managed.<\/p>\n<p>The third is the gap between maintenance and the store. The engineering department plans the work, procurement buys against requests, the store issues on demand. Three separate logics that meet only when the machine is already standing.<\/p>\n<h2>What JD Edwards closes<\/h2>\n<h3>Cost by stage<\/h3>\n<p>The cost structure follows stages rather than legal entities. Overburden, extraction, haulage, crushing, processing, metallurgical stage: each shows its own cost and its own yield. Co-products and returnable materials are costed with allocation rather than written off notionally.<\/p>\n<h3>Equipment as a source of cost<\/h3>\n<p>Every unit is an object carrying all related costs: fuel, repairs, parts, mechanics&#8217; labour, rental. Usage is recorded in engine hours or tonne-kilometres, and cost of ownership becomes a real number you can compare between machines and act on when deciding to replace.<\/p>\n<h3>Maintenance by usage and condition<\/h3>\n<p>Preventive work is planned from usage rather than the calendar. The maintenance schedule is built around the mining plan, so equipment comes out of service at the least painful moment. For critical assemblies, condition-based maintenance driven by measurements is added.<\/p>\n<h3>A spare parts store tied to maintenance<\/h3>\n<p>Parts demand is generated from the maintenance plan rather than from requests as they arise. The system sees that a specific assembly is due for repair in three weeks and checks availability in advance. Stock across the group is visible in one place, so a transfer becomes an alternative to a purchase.<\/p>\n<h3>Fuel and lubricants<\/h3>\n<p>Consumption standards are set by equipment type and operating conditions, actuals are recorded at refuelling against the machine. The difference is visible per unit rather than as one number for the area.<\/p>\n<h3>Health and safety<\/h3>\n<p>Permits, briefings and qualifications are linked to work on assets. The system will not allow a job to open on equipment without a valid permit for the person performing it. Incidents are recorded against location, equipment and type of work, and the statistics assemble themselves.<\/p>\n<h2>What it connects to<\/h2>\n<ul>\n<li><strong>Purchasing<\/strong> &#8211; requisitions generated from the maintenance plan rather than from an emergency.<\/li>\n<li><strong>Finance<\/strong> &#8211; stage cost reaches the ledger as the result of a calculation.<\/li>\n<li><strong>Warehouse and logistics<\/strong> &#8211; movement of ore, concentrate and finished product with weighbridge control.<\/li>\n<li><strong>Sales<\/strong> &#8211; shipment with the lot and quality attached.<\/li>\n<\/ul>\n<h2>How it is implemented<\/h2>\n<ol>\n<li><strong>Map of stages and assets.<\/strong> We describe the chain of stages and the equipment fleet and decide at what level cost detail is needed.<\/li>\n<li><strong>Equipment register.<\/strong> Units, components, usage standards, work catalogues. This stage usually shows that part of the fleet is recorded differently from how it actually operates.<\/li>\n<li><strong>Maintenance and the spare parts store.<\/strong> The chain of maintenance plan, parts demand and purchase, normally the fastest visible result.<\/li>\n<li><strong>Stage costing.<\/strong> The calculation is switched on and checked against what is currently done by hand.<\/li>\n<li><strong>Health and safety, and automation.<\/strong> Permits, incidents, scheduled operations and exchange with other systems.<\/li>\n<\/ol>\n<h2>Worth knowing up front<\/h2>\n<ul>\n<li>The reliability of cost figures rests on discipline in primary recording on site. If usage and consumption are recorded after the fact from memory, no system will fix that.<\/li>\n<li>The equipment register will have to be put in order, and that is work for the engineering department. We size the effort at the start so it does not become a surprise mid-project.<\/li>\n<li>The first honest cost of ownership figure often changes fleet renewal plans. It is worth being ready for that.<\/li>\n<\/ul>\n<h2>Frequent questions<\/h2>\n<h3>We already have a maintenance system. Why change?<\/h3>\n<p>You do not have to. The question is whether it is connected to costs and to the store. A standalone maintenance system solves the engineer&#8217;s problem but does not answer the question about cost per tonne. If it suits you, it can stay and be linked through an integration, and we will say plainly when that is more sensible than replacing it.<\/p>\n<h3>Does this work across several sites at once?<\/h3>\n<p>Yes. A multi-site structure with a shared equipment and parts catalogue is the typical scenario. Visibility of stock and demand across the group usually cuts purchasing straight away.<\/p>\n<h3>Is this too heavy for a mid-sized business?<\/h3>\n<p>The contour is deployed in parts. Starting with maintenance and the spare parts store needs no rebuild of the whole accounting model, and stage costing follows as the next step.<\/p>\n<h3>What about long term support?<\/h3>\n<p>Oracle has moved to continuous delivery: new features arrive without a version change and without a reimplementation. Premier Support for JD Edwards EnterpriseOne is guaranteed at least through 2037, with the date reviewed annually and extended.<\/p>\n<h2>Let us calculate your tonne<\/h2>\n<p>We will show you, on your own data, how cost looks by stage and what the fleet costs to own. We will work out where accuracy is lost today and what makes sense to tackle first.<\/p>\n<p class=\"rbc-rel\" style=\"margin:30px 0 0;font-size:15px;color:#5a6a8c;\">Section: <a href=\"https:\/\/rbc-grp.solutions\/oracle-jd-edwards-enterpriseone\/fondoemkie-proizvodstva\/\">asset-intensive industries<\/a>. Related solutions: <a href=\"https:\/\/rbc-grp.solutions\/oracle-jd-edwards-enterpriseone\/neftedobycha\/\">oil and gas production<\/a>, <a href=\"https:\/\/rbc-grp.solutions\/oracle-jd-edwards-enterpriseone\/neftepererabotka-i-sbyt\/\">refining and marketing<\/a>.<\/p>\n<div style=\"background:#0b1f6b;border-radius:16px;padding:28px 32px 24px;margin:34px 0 24px;color:#d7e2fb;\">\n<p style=\"margin:0 0 8px;font-size:13px;font-weight:700;letter-spacing:.08em;text-transform:uppercase;color:#8fb2ff;\">A workshop on your data<\/p>\n<p style=\"margin:0 0 16px;font-size:19px;font-weight:700;color:#ffffff;line-height:1.4;\">We take one processing stage and part of the fleet: cost per tonne and what the machines cost to own.<\/p>\n<ul style=\"margin:0;padding-left:20px;\">\n<li style=\"margin:0 0 8px;color:#d7e2fb;\">What you get: a written map of the gaps on the area we reviewed, plus an estimate of the stages and the effort involved.<\/li>\n<li style=\"margin:0 0 8px;color:#d7e2fb;\">What we need from you: 2-3 hours of your specialists&#8217; time and access to data extracts.<\/li>\n<li style=\"margin:0;color:#d7e2fb;\">Timing: two weeks from the first meeting to the result. No commitment, no prepayment.<\/li>\n<\/ul>\n<\/div>\n\n<div class=\"wpcf7 no-js\" id=\"wpcf7-f8317-o1\" lang=\"en-US\" dir=\"ltr\" data-wpcf7-id=\"8317\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/en\/wp-json\/wp\/v2\/pages\/8344#wpcf7-f8317-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<fieldset class=\"hidden-fields-container\"><input type=\"hidden\" name=\"_wpcf7\" value=\"8317\" \/><input type=\"hidden\" name=\"_wpcf7_version\" value=\"6.1.7\" \/><input type=\"hidden\" name=\"_wpcf7_locale\" value=\"en_US\" \/><input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f8317-o1\" \/><input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/><input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<\/fieldset>\n<p><label> Name and surname<br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"your-name\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" autocomplete=\"name\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"text\" name=\"your-name\" \/><\/span> <\/label>\n<\/p>\n<p><label> Company<br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"company\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" autocomplete=\"organization\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"text\" name=\"company\" \/><\/span> <\/label>\n<\/p>\n<p><label> Work email<br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"your-email\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-email wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-email\" autocomplete=\"email\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"email\" name=\"your-email\" \/><\/span> <\/label>\n<\/p>\n<p><label> Phone or messenger (optional)<br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"tel\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text\" autocomplete=\"tel\" aria-invalid=\"false\" value=\"\" type=\"text\" name=\"tel\" \/><\/span> <\/label>\n<\/p>\n<p><label> What would you like us to look at (optional)<br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"your-message\"><textarea cols=\"40\" rows=\"10\" maxlength=\"2000\" class=\"wpcf7-form-control wpcf7-textarea\" aria-invalid=\"false\" name=\"your-message\"><\/textarea><\/span> <\/label>\n<\/p>\n<p><input class=\"wpcf7-form-control wpcf7-submit has-spinner\" type=\"submit\" value=\"Request a workshop\" \/>\n<\/p><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>In mining, cost per tonne decides everything, and it is built from what happens in the pit, not in the accounting office. A truck stood idle for a shift, an excavator went into unplanned repair, the part was not on the shelf, diesel was written off as a single line for the whole area. Each<\/p>\n","protected":false},"author":6,"featured_media":0,"parent":5175,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"footnotes":""},"class_list":["post-8344","page","type-page","status-publish","hentry"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.3 - aioseo.com -->\n\t<meta name=\"description\" content=\"JD Edwards for mining and metals: cost per tonne by stage, cost of owning the fleet, maintenance by usage and a spare parts store in one contour.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/mining-and-metals\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.3\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Enterprise Automation and Management | Enterprise Management Systems\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"JD Edwards for mining and metals | RBC Group\" \/>\n\t\t<meta property=\"og:description\" content=\"JD Edwards for mining and metals: cost per tonne by stage, cost of owning the fleet, maintenance by usage and a spare parts store in one contour.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/mining-and-metals\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/rbc-grp.solutions\/wp-content\/uploads\/2018\/03\/rbc_fb.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/rbc-grp.solutions\/wp-content\/uploads\/2018\/03\/rbc_fb.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-11-27T18:50:10+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-11-27T19:06:59+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/rbcgroupsolutions\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"JD Edwards for mining and metals | RBC Group\" \/>\n\t\t<meta name=\"twitter:description\" content=\"JD Edwards for mining and metals: cost per tonne by stage, cost of owning the fleet, maintenance by usage and a spare parts store in one contour.\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/rbc-grp.solutions\/wp-content\/uploads\/2018\/03\/rbc_fb.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/oracle-jd-edwards-enterpriseone\\\/mining-and-metals\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/#listItem\",\"position\":1,\"name\":\"\\u0413\\u043b\\u0430\\u0432\\u043d\\u0430\\u044f\",\"item\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/oracle-jd-edwards-enterpriseone\\\/#listItem\",\"name\":\"Oracle JD Edwards EnterpriseOne\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/oracle-jd-edwards-enterpriseone\\\/#listItem\",\"position\":2,\"name\":\"Oracle JD Edwards EnterpriseOne\",\"item\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/oracle-jd-edwards-enterpriseone\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/oracle-jd-edwards-enterpriseone\\\/mining-and-metals\\\/#listItem\",\"name\":\"JD Edwards for mining and metals\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/#listItem\",\"name\":\"\\u0413\\u043b\\u0430\\u0432\\u043d\\u0430\\u044f\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/oracle-jd-edwards-enterpriseone\\\/mining-and-metals\\\/#listItem\",\"position\":3,\"name\":\"JD Edwards for mining and metals\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/oracle-jd-edwards-enterpriseone\\\/#listItem\",\"name\":\"Oracle JD Edwards EnterpriseOne\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/#organization\",\"name\":\"RBC Group\",\"description\":\"Enterprise Management Systems\",\"url\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/\",\"email\":\"marketing@rbc-grp.solutions\",\"telephone\":\"+77272581712\",\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/rbcgroupsolutions\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/rbc-group-solutions\"]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/oracle-jd-edwards-enterpriseone\\\/mining-and-metals\\\/#webpage\",\"url\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/oracle-jd-edwards-enterpriseone\\\/mining-and-metals\\\/\",\"name\":\"JD Edwards for mining and metals | RBC Group\",\"description\":\"JD Edwards for mining and metals: cost per tonne by stage, cost of owning the fleet, maintenance by usage and a spare parts store in one contour.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/oracle-jd-edwards-enterpriseone\\\/mining-and-metals\\\/#breadcrumblist\"},\"datePublished\":\"2026-11-28T00:50:10+06:00\",\"dateModified\":\"2026-11-28T01:06:59+06:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/\",\"name\":\"RBC Group\",\"description\":\"Enterprise Management Systems\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"JD Edwards for mining and metals | RBC Group","description":"JD Edwards for mining and metals: cost per tonne by stage, cost of owning the fleet, maintenance by usage and a spare parts store in one contour.","canonical_url":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/mining-and-metals\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BreadcrumbList","@id":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/mining-and-metals\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/rbc-grp.solutions\/en\/#listItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f","item":"https:\/\/rbc-grp.solutions\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/#listItem","name":"Oracle JD Edwards EnterpriseOne"}},{"@type":"ListItem","@id":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/#listItem","position":2,"name":"Oracle JD Edwards EnterpriseOne","item":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/","nextItem":{"@type":"ListItem","@id":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/mining-and-metals\/#listItem","name":"JD Edwards for mining and metals"},"previousItem":{"@type":"ListItem","@id":"https:\/\/rbc-grp.solutions\/en\/#listItem","name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f"}},{"@type":"ListItem","@id":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/mining-and-metals\/#listItem","position":3,"name":"JD Edwards for mining and metals","previousItem":{"@type":"ListItem","@id":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/#listItem","name":"Oracle JD Edwards EnterpriseOne"}}]},{"@type":"Organization","@id":"https:\/\/rbc-grp.solutions\/en\/#organization","name":"RBC Group","description":"Enterprise Management Systems","url":"https:\/\/rbc-grp.solutions\/en\/","email":"marketing@rbc-grp.solutions","telephone":"+77272581712","sameAs":["https:\/\/www.facebook.com\/rbcgroupsolutions\/","https:\/\/www.linkedin.com\/company\/rbc-group-solutions"]},{"@type":"WebPage","@id":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/mining-and-metals\/#webpage","url":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/mining-and-metals\/","name":"JD Edwards for mining and metals | RBC Group","description":"JD Edwards for mining and metals: cost per tonne by stage, cost of owning the fleet, maintenance by usage and a spare parts store in one contour.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/rbc-grp.solutions\/en\/#website"},"breadcrumb":{"@id":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/mining-and-metals\/#breadcrumblist"},"datePublished":"2026-11-28T00:50:10+06:00","dateModified":"2026-11-28T01:06:59+06:00"},{"@type":"WebSite","@id":"https:\/\/rbc-grp.solutions\/en\/#website","url":"https:\/\/rbc-grp.solutions\/en\/","name":"RBC Group","description":"Enterprise Management Systems","inLanguage":"en-US","publisher":{"@id":"https:\/\/rbc-grp.solutions\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"Enterprise Automation and Management | Enterprise Management Systems","og:type":"article","og:title":"JD Edwards for mining and metals | RBC Group","og:description":"JD Edwards for mining and metals: cost per tonne by stage, cost of owning the fleet, maintenance by usage and a spare parts store in one contour.","og:url":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/mining-and-metals\/","og:image":"https:\/\/rbc-grp.solutions\/wp-content\/uploads\/2018\/03\/rbc_fb.png","og:image:secure_url":"https:\/\/rbc-grp.solutions\/wp-content\/uploads\/2018\/03\/rbc_fb.png","og:image:width":1200,"og:image:height":630,"article:published_time":"2026-11-27T18:50:10+00:00","article:modified_time":"2026-11-27T19:06:59+00:00","article:publisher":"https:\/\/www.facebook.com\/rbcgroupsolutions\/","twitter:card":"summary_large_image","twitter:title":"JD Edwards for mining and metals | RBC Group","twitter:description":"JD Edwards for mining and metals: cost per tonne by stage, cost of owning the fleet, maintenance by usage and a spare parts store in one contour.","twitter:image":"https:\/\/rbc-grp.solutions\/wp-content\/uploads\/2018\/03\/rbc_fb.png"},"aioseo_meta_data":{"post_id":"8344","title":null,"description":"JD Edwards for mining and metals: cost per tonne by stage, cost of owning the fleet, maintenance by usage and a spare parts store in one contour.","keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"WebPage","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-11-27 19:05:55","updated":"2026-11-27 19:54:30","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/rbc-grp.solutions\/en\/\" title=\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f\">\u0413\u043b\u0430\u0432\u043d\u0430\u044f<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/\" title=\"Oracle JD Edwards EnterpriseOne\">Oracle JD Edwards EnterpriseOne<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tJD Edwards for mining and metals\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f","link":"https:\/\/rbc-grp.solutions\/en\/"},{"label":"Oracle JD Edwards EnterpriseOne","link":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/"},{"label":"JD Edwards for mining and metals","link":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/mining-and-metals\/"}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/rbc-grp.solutions\/en\/wp-json\/wp\/v2\/pages\/8344","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rbc-grp.solutions\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/rbc-grp.solutions\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/rbc-grp.solutions\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/rbc-grp.solutions\/en\/wp-json\/wp\/v2\/comments?post=8344"}],"version-history":[{"count":4,"href":"https:\/\/rbc-grp.solutions\/en\/wp-json\/wp\/v2\/pages\/8344\/revisions"}],"predecessor-version":[{"id":8348,"href":"https:\/\/rbc-grp.solutions\/en\/wp-json\/wp\/v2\/pages\/8344\/revisions\/8348"}],"up":[{"embeddable":true,"href":"https:\/\/rbc-grp.solutions\/en\/wp-json\/wp\/v2\/pages\/5175"}],"wp:attachment":[{"href":"https:\/\/rbc-grp.solutions\/en\/wp-json\/wp\/v2\/media?parent=8344"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}