{"id":8324,"date":"2026-11-28T00:49:39","date_gmt":"2026-11-27T18:49:39","guid":{"rendered":"https:\/\/rbc-grp.solutions\/?page_id=8324"},"modified":"2026-11-28T01:02:04","modified_gmt":"2026-11-27T19:02:04","slug":"construction-and-engineering","status":"publish","type":"page","link":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/construction-and-engineering\/","title":{"rendered":"JD Edwards and Primavera P6 for construction and engineering companies"},"content":{"rendered":"<p><strong>A construction company lives in two systems that never agree. The schedule sits in Primavera, the money sits in the ledger.<\/strong> The schedule says 40% complete, accounting says 60% of budget spent, and nobody can tell you whether that is a failure or normal. Oracle Primavera P6 and JD Edwards EnterpriseOne remove that gap: the cost structure and the work breakdown are mapped once, and from then on actuals, commitments and forecast live on the same project.<\/p>\n<div style=\"background:#eaf0fd;border-radius:16px;padding:22px 28px 16px;margin:26px 0 32px;\">\n<p style=\"margin:0 0 10px;font-size:13px;font-weight:700;letter-spacing:.08em;text-transform:uppercase;color:#1f4fd8;\">In short<\/p>\n<ul style=\"margin:0;padding-left:20px;color:#14213d;\">\n<li style=\"margin:0 0 8px;\">Project costs by site, phase, type of work and cost code, down to the journal entry.<\/li>\n<li style=\"margin:0 0 8px;\">Subcontract and purchase commitments visible before they reach accounting.<\/li>\n<li style=\"margin:0 0 8px;\">Estimate at completion for the site, not just last month&#8217;s actuals.<\/li>\n<li style=\"margin:0 0 8px;\">Client billing by percent complete, by milestone or by work performed.<\/li>\n<li style=\"margin:0 0 8px;\">Equipment costs charged to the site where the machine worked, maintenance by usage, rental as its own business.<\/li>\n<li style=\"margin:0;\">Primavera P6 supplies schedule and progress, JD Edwards supplies money. Earned value is calculated for real.<\/li>\n<\/ul>\n<\/div>\n<h2>Sound familiar?<\/h2>\n<ul>\n<li>Cost overruns on a site surface at closeout, when nothing can be done about them.<\/li>\n<li>A signed subcontract exists as a fact, but appears in project economics only with the certificate.<\/li>\n<li>Materials are issued to the site in general rather than to a phase, so the cost per stage is unknown.<\/li>\n<li>The same excavator is booked to two sites because the transfer was never recorded.<\/li>\n<li>Progress for the client is prepared in a spreadsheet, separately from the ledger.<\/li>\n<li>The estimate at completion is the chief engineer&#8217;s personal file, and that is the only source of truth.<\/li>\n<\/ul>\n<h2>Why the schedule and the money never meet<\/h2>\n<p>The cause is structural. The schedule lives where the unit of account is an activity. The money lives where the unit of account is a journal entry. Nobody ever mapped those two structures to each other, so reconciliation happens by hand and in meetings.<\/p>\n<p>Until the link exists, earned value cannot be calculated. You can count money spent and you can count work completed, but you cannot answer the question that decides everything: does the money spent match the work done. That is why overruns are always discovered late.<\/p>\n<p>The second cause is commitments. A large subcontract exists the day it is signed, yet enters the economics of the site only when the certificate arrives. Between those two dates the project looks cheaper than it really is, and decisions get made on that false picture.<\/p>\n<h2>What the solution closes<\/h2>\n<h3>Project costs with real detail<\/h3>\n<p>Costs are collected by site, phase, type of work and cost code. Any figure can be expanded down to the document behind it. Overheads are allocated by rules rather than spread evenly at period close.<\/p>\n<h3>Commitments under control<\/h3>\n<p>Subcontracts and purchase orders create commitments the moment they are signed. The project manager sees spent and committed together, which is the only honest view of the remaining budget.<\/p>\n<h3>Earned value and the forecast<\/h3>\n<p>Progress from Primavera and costs from JD Edwards produce earned value with cost and schedule variance. The estimate at completion is recalculated when the schedule or the actuals move, not assembled by hand before a board meeting.<\/p>\n<h3>Billing the client<\/h3>\n<p>Invoices are produced by percent complete, by milestone or by work performed, according to the contract. Retentions, advances and offsets are part of the scheme rather than manual corrections.<\/p>\n<h3>Equipment, maintenance and rental<\/h3>\n<p>Machine costs are charged to the site where the machine actually worked, based on usage. Maintenance is planned by hours or kilometres. If equipment is also rented out, that is tracked as a separate line of business with its own profitability.<\/p>\n<h3>From construction to operation<\/h3>\n<p>When a site is handed over, the asset does not disappear from the system. It moves into operation: leases, maintenance, repairs and running costs continue in the same contour, so the full life cycle stays in one place.<\/p>\n<h2>How it is implemented<\/h2>\n<ol>\n<li><strong>Project structure.<\/strong> We agree how the work breakdown and the cost structure connect. The most important stage: a mistake here costs more than all the ones after it.<\/li>\n<li><strong>Costs and commitments.<\/strong> Actuals and commitment control on one pilot site.<\/li>\n<li><strong>Schedule and earned value.<\/strong> Primavera is connected and progress is linked to money.<\/li>\n<li><strong>Billing and settlements.<\/strong> Client invoices, retentions, subcontractor settlements.<\/li>\n<li><strong>Rollout.<\/strong> The remaining sites follow the proven template.<\/li>\n<\/ol>\n<h2>Working with other systems<\/h2>\n<p>The solution does not replace design software or estimating packages. It takes quantities and estimates from them and returns the economics. Exchange is configured in Orchestrator Studio as an integration scenario rather than custom development for each source.<\/p>\n<h2>Worth knowing up front<\/h2>\n<ul>\n<li>Primavera is not always necessary. For short, simple sites, phases and milestones inside JD Edwards are enough, and we will say so rather than sell an extra licence.<\/li>\n<li>The link only works with discipline on site. If progress is closed after the fact, the forecast will honestly show noise.<\/li>\n<li>The first profitability run by site usually changes which contracts you decide to take. That is the point.<\/li>\n<\/ul>\n<h2>Frequent questions<\/h2>\n<h3>We already use Primavera. Does it have to be replaced?<\/h3>\n<p>No. Primavera stays and becomes the source of schedule and progress, connected to JD Edwards through Orchestrator Studio.<\/p>\n<h3>Can we start without a scheduling system?<\/h3>\n<p>Yes. Start with costs and commitments by site. That gives a fast result and needs no schedule. Earned value comes later, when Primavera is connected.<\/p>\n<h3>Does this work for an engineering company without construction?<\/h3>\n<p>Yes. Design institutes, engineering and consulting follow the same logic: project, phases, labour, commitments, milestone billing.<\/p>\n<h3>What about long term support?<\/h3>\n<p>Oracle has moved to continuous delivery: new features arrive without a version change and without a reimplementation. Premier Support for JD Edwards EnterpriseOne is guaranteed at least through 2037, with the date reviewed annually and extended.<\/p>\n<h2>Let us look at the economics of your sites<\/h2>\n<p>We will show you, on your own data, how cost structure, subcontractor commitments and the estimate at completion look for one site. We will work out what makes sense to tackle first in your situation.<\/p>\n<p class=\"rbc-rel\" style=\"margin:30px 0 0;font-size:15px;color:#5a6a8c;\">Section: <a href=\"https:\/\/rbc-grp.solutions\/oracle-jd-edwards-enterpriseone\/proektnyj-biznes\/\">project-driven business<\/a>. Related solution: <a href=\"https:\/\/rbc-grp.solutions\/oracle-jd-edwards-enterpriseone\/proizvodstvo-pod-zakaz-eto\/\">engineer to order manufacturing<\/a>.<\/p>\n<div style=\"background:#0b1f6b;border-radius:16px;padding:28px 32px 24px;margin:34px 0 24px;color:#d7e2fb;\">\n<p style=\"margin:0 0 8px;font-size:13px;font-weight:700;letter-spacing:.08em;text-transform:uppercase;color:#8fb2ff;\">A workshop on your data<\/p>\n<p style=\"margin:0 0 16px;font-size:19px;font-weight:700;color:#ffffff;line-height:1.4;\">We take one of your sites: cost structure, subcontractor commitments, earned value and the estimate at completion.<\/p>\n<ul style=\"margin:0;padding-left:20px;\">\n<li style=\"margin:0 0 8px;color:#d7e2fb;\">What you get: a written map of the gaps on the area we reviewed, plus an estimate of the stages and the effort involved.<\/li>\n<li style=\"margin:0 0 8px;color:#d7e2fb;\">What we need from you: 2-3 hours of your specialists&#8217; time and access to data extracts.<\/li>\n<li style=\"margin:0;color:#d7e2fb;\">Timing: two weeks from the first meeting to the result. No commitment, no prepayment.<\/li>\n<\/ul>\n<\/div>\n\n<div class=\"wpcf7 no-js\" id=\"wpcf7-f8317-o1\" lang=\"en-US\" dir=\"ltr\" data-wpcf7-id=\"8317\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/en\/wp-json\/wp\/v2\/pages\/8324#wpcf7-f8317-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<fieldset class=\"hidden-fields-container\"><input type=\"hidden\" name=\"_wpcf7\" value=\"8317\" \/><input type=\"hidden\" name=\"_wpcf7_version\" value=\"6.1.7\" \/><input type=\"hidden\" name=\"_wpcf7_locale\" value=\"en_US\" \/><input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f8317-o1\" \/><input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/><input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<\/fieldset>\n<p><label> Name and surname<br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"your-name\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" autocomplete=\"name\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"text\" name=\"your-name\" \/><\/span> <\/label>\n<\/p>\n<p><label> Company<br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"company\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" autocomplete=\"organization\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"text\" name=\"company\" \/><\/span> <\/label>\n<\/p>\n<p><label> Work email<br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"your-email\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-email wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-email\" autocomplete=\"email\" aria-required=\"true\" aria-invalid=\"false\" value=\"\" type=\"email\" name=\"your-email\" \/><\/span> <\/label>\n<\/p>\n<p><label> Phone or messenger (optional)<br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"tel\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text\" autocomplete=\"tel\" aria-invalid=\"false\" value=\"\" type=\"text\" name=\"tel\" \/><\/span> <\/label>\n<\/p>\n<p><label> What would you like us to look at (optional)<br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"your-message\"><textarea cols=\"40\" rows=\"10\" maxlength=\"2000\" class=\"wpcf7-form-control wpcf7-textarea\" aria-invalid=\"false\" name=\"your-message\"><\/textarea><\/span> <\/label>\n<\/p>\n<p><input class=\"wpcf7-form-control wpcf7-submit has-spinner\" type=\"submit\" value=\"Request a workshop\" \/>\n<\/p><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>A construction company lives in two systems that never agree. The schedule sits in Primavera, the money sits in the ledger. The schedule says 40% complete, accounting says 60% of budget spent, and nobody can tell you whether that is a failure or normal. Oracle Primavera P6 and JD Edwards EnterpriseOne remove that gap: the<\/p>\n","protected":false},"author":6,"featured_media":0,"parent":5175,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_jetpack_hide_featured_image":false,"_jetpack_featured_image_duplicate_dismissed":0,"footnotes":""},"class_list":["post-8324","page","type-page","status-publish","hentry"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.3 - aioseo.com -->\n\t<meta name=\"description\" content=\"Oracle Primavera P6 and JD Edwards for contractors: project costs, subcontractor commitments, earned value and estimate at completion on one site.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/construction-and-engineering\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.3\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Enterprise Automation and Management | Enterprise Management Systems\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"JD Edwards and Primavera P6 for construction | RBC Group\" \/>\n\t\t<meta property=\"og:description\" content=\"Oracle Primavera P6 and JD Edwards for contractors: project costs, subcontractor commitments, earned value and estimate at completion on one site.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/construction-and-engineering\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/rbc-grp.solutions\/wp-content\/uploads\/2018\/03\/rbc_fb.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/rbc-grp.solutions\/wp-content\/uploads\/2018\/03\/rbc_fb.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-11-27T18:49:39+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-11-27T19:02:04+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/rbcgroupsolutions\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"JD Edwards and Primavera P6 for construction | RBC Group\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Oracle Primavera P6 and JD Edwards for contractors: project costs, subcontractor commitments, earned value and estimate at completion on one site.\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/rbc-grp.solutions\/wp-content\/uploads\/2018\/03\/rbc_fb.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/oracle-jd-edwards-enterpriseone\\\/construction-and-engineering\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/#listItem\",\"position\":1,\"name\":\"\\u0413\\u043b\\u0430\\u0432\\u043d\\u0430\\u044f\",\"item\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/oracle-jd-edwards-enterpriseone\\\/#listItem\",\"name\":\"Oracle JD Edwards EnterpriseOne\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/oracle-jd-edwards-enterpriseone\\\/#listItem\",\"position\":2,\"name\":\"Oracle JD Edwards EnterpriseOne\",\"item\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/oracle-jd-edwards-enterpriseone\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/oracle-jd-edwards-enterpriseone\\\/construction-and-engineering\\\/#listItem\",\"name\":\"JD Edwards and Primavera P6 for construction and engineering companies\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/#listItem\",\"name\":\"\\u0413\\u043b\\u0430\\u0432\\u043d\\u0430\\u044f\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/oracle-jd-edwards-enterpriseone\\\/construction-and-engineering\\\/#listItem\",\"position\":3,\"name\":\"JD Edwards and Primavera P6 for construction and engineering companies\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/oracle-jd-edwards-enterpriseone\\\/#listItem\",\"name\":\"Oracle JD Edwards EnterpriseOne\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/#organization\",\"name\":\"RBC Group\",\"description\":\"Enterprise Management Systems\",\"url\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/\",\"email\":\"marketing@rbc-grp.solutions\",\"telephone\":\"+77272581712\",\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/rbcgroupsolutions\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/rbc-group-solutions\"]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/oracle-jd-edwards-enterpriseone\\\/construction-and-engineering\\\/#webpage\",\"url\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/oracle-jd-edwards-enterpriseone\\\/construction-and-engineering\\\/\",\"name\":\"JD Edwards and Primavera P6 for construction | RBC Group\",\"description\":\"Oracle Primavera P6 and JD Edwards for contractors: project costs, subcontractor commitments, earned value and estimate at completion on one site.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/oracle-jd-edwards-enterpriseone\\\/construction-and-engineering\\\/#breadcrumblist\"},\"datePublished\":\"2026-11-28T00:49:39+06:00\",\"dateModified\":\"2026-11-28T01:02:04+06:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/\",\"name\":\"RBC Group\",\"description\":\"Enterprise Management Systems\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/rbc-grp.solutions\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"JD Edwards and Primavera P6 for construction | RBC Group","description":"Oracle Primavera P6 and JD Edwards for contractors: project costs, subcontractor commitments, earned value and estimate at completion on one site.","canonical_url":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/construction-and-engineering\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BreadcrumbList","@id":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/construction-and-engineering\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/rbc-grp.solutions\/en\/#listItem","position":1,"name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f","item":"https:\/\/rbc-grp.solutions\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/#listItem","name":"Oracle JD Edwards EnterpriseOne"}},{"@type":"ListItem","@id":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/#listItem","position":2,"name":"Oracle JD Edwards EnterpriseOne","item":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/","nextItem":{"@type":"ListItem","@id":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/construction-and-engineering\/#listItem","name":"JD Edwards and Primavera P6 for construction and engineering companies"},"previousItem":{"@type":"ListItem","@id":"https:\/\/rbc-grp.solutions\/en\/#listItem","name":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f"}},{"@type":"ListItem","@id":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/construction-and-engineering\/#listItem","position":3,"name":"JD Edwards and Primavera P6 for construction and engineering companies","previousItem":{"@type":"ListItem","@id":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/#listItem","name":"Oracle JD Edwards EnterpriseOne"}}]},{"@type":"Organization","@id":"https:\/\/rbc-grp.solutions\/en\/#organization","name":"RBC Group","description":"Enterprise Management Systems","url":"https:\/\/rbc-grp.solutions\/en\/","email":"marketing@rbc-grp.solutions","telephone":"+77272581712","sameAs":["https:\/\/www.facebook.com\/rbcgroupsolutions\/","https:\/\/www.linkedin.com\/company\/rbc-group-solutions"]},{"@type":"WebPage","@id":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/construction-and-engineering\/#webpage","url":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/construction-and-engineering\/","name":"JD Edwards and Primavera P6 for construction | RBC Group","description":"Oracle Primavera P6 and JD Edwards for contractors: project costs, subcontractor commitments, earned value and estimate at completion on one site.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/rbc-grp.solutions\/en\/#website"},"breadcrumb":{"@id":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/construction-and-engineering\/#breadcrumblist"},"datePublished":"2026-11-28T00:49:39+06:00","dateModified":"2026-11-28T01:02:04+06:00"},{"@type":"WebSite","@id":"https:\/\/rbc-grp.solutions\/en\/#website","url":"https:\/\/rbc-grp.solutions\/en\/","name":"RBC Group","description":"Enterprise Management Systems","inLanguage":"en-US","publisher":{"@id":"https:\/\/rbc-grp.solutions\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"Enterprise Automation and Management | Enterprise Management Systems","og:type":"article","og:title":"JD Edwards and Primavera P6 for construction | RBC Group","og:description":"Oracle Primavera P6 and JD Edwards for contractors: project costs, subcontractor commitments, earned value and estimate at completion on one site.","og:url":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/construction-and-engineering\/","og:image":"https:\/\/rbc-grp.solutions\/wp-content\/uploads\/2018\/03\/rbc_fb.png","og:image:secure_url":"https:\/\/rbc-grp.solutions\/wp-content\/uploads\/2018\/03\/rbc_fb.png","og:image:width":1200,"og:image:height":630,"article:published_time":"2026-11-27T18:49:39+00:00","article:modified_time":"2026-11-27T19:02:04+00:00","article:publisher":"https:\/\/www.facebook.com\/rbcgroupsolutions\/","twitter:card":"summary_large_image","twitter:title":"JD Edwards and Primavera P6 for construction | RBC Group","twitter:description":"Oracle Primavera P6 and JD Edwards for contractors: project costs, subcontractor commitments, earned value and estimate at completion on one site.","twitter:image":"https:\/\/rbc-grp.solutions\/wp-content\/uploads\/2018\/03\/rbc_fb.png"},"aioseo_meta_data":{"post_id":"8324","title":"JD Edwards and Primavera P6 for construction | RBC Group","description":"Oracle Primavera P6 and JD Edwards for contractors: project costs, subcontractor commitments, earned value and estimate at completion on one site.","keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"WebPage","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-11-27 19:01:01","updated":"2026-11-27 19:53:30","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/rbc-grp.solutions\/en\/\" title=\"\u0413\u043b\u0430\u0432\u043d\u0430\u044f\">\u0413\u043b\u0430\u0432\u043d\u0430\u044f<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/\" title=\"Oracle JD Edwards EnterpriseOne\">Oracle JD Edwards EnterpriseOne<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tJD Edwards and Primavera P6 for construction and engineering companies\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"\u0413\u043b\u0430\u0432\u043d\u0430\u044f","link":"https:\/\/rbc-grp.solutions\/en\/"},{"label":"Oracle JD Edwards EnterpriseOne","link":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/"},{"label":"JD Edwards and Primavera P6 for construction and engineering companies","link":"https:\/\/rbc-grp.solutions\/en\/oracle-jd-edwards-enterpriseone\/construction-and-engineering\/"}],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/rbc-grp.solutions\/en\/wp-json\/wp\/v2\/pages\/8324","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rbc-grp.solutions\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/rbc-grp.solutions\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/rbc-grp.solutions\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/rbc-grp.solutions\/en\/wp-json\/wp\/v2\/comments?post=8324"}],"version-history":[{"count":4,"href":"https:\/\/rbc-grp.solutions\/en\/wp-json\/wp\/v2\/pages\/8324\/revisions"}],"predecessor-version":[{"id":8328,"href":"https:\/\/rbc-grp.solutions\/en\/wp-json\/wp\/v2\/pages\/8324\/revisions\/8328"}],"up":[{"embeddable":true,"href":"https:\/\/rbc-grp.solutions\/en\/wp-json\/wp\/v2\/pages\/5175"}],"wp:attachment":[{"href":"https:\/\/rbc-grp.solutions\/en\/wp-json\/wp\/v2\/media?parent=8324"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}